CLP Environmental Review for Castle Peak Cable Tunnel, Hong Kong
Atkins was responsible for the preparation of an Environmental Assessment for CLP's ¡§Castle Peak Cable Tunnel¡¨ Project. The cable tunnel will be bored through the mountainous area of Castle Peak by use of tunnel boring machine (TBM) to minimize environmental impacts associated with the power cables, and to increase the reliability of the system. The tunnel will be approximately 4.5km long with a 4.5m internal diameter to contain eight 132kV cable circuits. The Environmental Assessment provides evaluation of the potential environmental impacts associated with the construction and operation of the Project, including noise, landscape and visual resources, ecology, dust, waste management, and water quality issues. Mitigation measures and the requirements on environmental monitoring and audit have been recommended.
|