Feasibility Study of Introducing Trolley Bus System in Hong Kong
ACL were appointed by TD to carry out this high profile multi-disciplinary study to assess the technical, operational, financial, institutional and environmental implications of the introduction of electrically-powered buses, including bus network planning, vehicle selection, infrastructure requirements and interface issues, operational constraints, implementation/safety considerations, environmental benefits, and cost/revenue assessments, with case studies for Central to Wan Chai corridor, Aberdeen to Ap Lei Chau, and the proposed South East Kowloon Development (SEKD) area.
|