Shatin Central Link - Central Link SDC700 and SDC400
As part of its role as KCRCs scheme designer for the Shatin Central Link, Atkins was responsible for the assessment of several highway structures along the alignment that would be affected by the proposed railway alignment.
The assessment of the structures was carried out using soil structure interaction to assess the effects of ground movements and AAA levels were established. A condition survey was carried out and reports prepared on the condition and structural assessment for approval by the appropriate authority. Several structures were assessed included:
SDC400 ¡V Cheong Wan Road Viaduct (condition survey, parapet strengthening, complete and partial reprovision options)
Tates Cairn Tunnel Approach Viaducts and Prince Edward Road Interchange (ground movement assessment, underpinning, ground treatment) SDC 700 - Upper Albert Road Bridge (condition survey, underpinning) |